Designed and managed a bypass staged downstream Gordam Ross Dam for micro-tunneling. Design includes consideration for average and peak flow rates, alarm systems, pump efficiency and pipe design. System was designed with a peak flow rate of 3,500 USgpm. My experience includes complete planning, management and decommissioning of the pumping, fused HDPE piping, safety and spill response plan and an automated alarm system.

Gordan Ross Dam Bypass
Complete Turn-key Pumping, commissioning, decommissioning, safety plan and layout drawings