top of page
Mimico Creek Bypass

Download PDF Drawings

Designed and managed a creek bypass, along with cofferdam design, safety and redundancy plans. System was designed with a peak flow rate of 15,858 USgpm. My experience includes complete planning, management and decommissioning of the pumping, pressure relief system, fused HDPE piping, safety and spill response plan and automated alarm system.

Mimico Creek Bypass

Complete Turnkey Pumping, commissioning, decommissioning, safety plan and layout drawings

+1-647-938-8550

360 Shirley Dr
San Marcos, San Diego County 92069
USA

  • instagram

©2017 by Mohammad Zafar

bottom of page